In the UK, planning started on Hinkley Point in 2010. It was supposed to run at 3 TW by 2020, costing £24 per MWh. It's now 13 years into a process that is projected to complete in another 5 years, eventually producing energy for £90 per MWh. In roughly the same period of time 30 TW of wind capacity have been installed. Even if you discount windfarm capacity at an aggressive 4:1, wind has already succeeded in producing 2.5 times what nuclear said it would be able to and failed at. Onshore wind is being delivered at a per MWh cost below that of the new nuke, if it ever runs. The offshore cost is much lower still. |
|