|
|
|
|
|
by sapling-ginger
952 days ago
|
|
Same reason a top of the line PC tower still has crappy stamped metal frame and crappy injection molded plastic trims. The main contractor of the elevator unit is a mechanical engineering company, they contract out the control unit to the lowest bidder. |
|