Y
Hacker News
new
|
ask
|
show
|
jobs
by
jojobas
970 days ago
One could mandate a modular design so that the communication pcb could be replaced, i.e. less e-waste. I wonder if smart meter manufacturers stay in business long enough for it to matter.
2 comments
Haemm0r
970 days ago
Our local suppliers smart meters communicate over the grid (provided the next substation with a beacon is near enough).
link
bayindirh
970 days ago
The one I saw used BT4.2 to talk with the meter, and cellular network to push data to cloud (IIRC).
The video is at
https://youtu.be/G32NYQpvy8Q?si=YjQfnY9Ag7YUGJAd
link