by hef19898 972 days ago
The Hinkley C site was approved in 2010, it is estimated to go live in 2028. It was laready two years late in May 2022, and already overshot the budget by 50% by then. As of February 2023, the delay increased by another 15 months (resulting in the 2028 go live) and costs increased again to now 32.7 billion pounds. And already in 2020, new wind and solar utility scale projects were cheaper per kWh than Hinkley, withbsolar becoming cheaper and cheaper every year (Moore's law is still valid there).

Hinkley C is 3,260 MWe. In 2022 Europe installed a total of 41.4 GW of solar capacity, up from from 28.1 GW in 2021. That means more than 10x Hinkley C in a single year (2022), and cheaper per kWh.

Facts to found here:

https://api.solarpowereurope.org/uploads/5222_SPE_EMO_2022_f...

Nuclear is great stop gap until more renewablea are installed, not more not less.

And before ypu start, no, the German nuclear plants couldn't be run any longer (maintenance, fuel, safety), run time has already been extended multiple times, and the last nuclear exit, the badly organized one, was put in place by tze conservative CDU let government (not that you go and blame the Greens for it).