|
|
|
|
|
by zamalek
977 days ago
|
|
I don't think the rage is totally uncalled for. A 15 minute standup on a 5 person team is actually over a full hour lost. Put another way, a company with 50 engineers doing 15 minute standup every day is over 400 work days of lost productivity each year - basically 2 engineers extra. Assuming that stand-ups result in increased productivity, and that's a big assumption (likely exactly the opposite to the reality), have you really tallied up how much it's making vs how much it's costing? It certainly makes me mad. |
|
> Which absolute fucking maniac in this room decided that the most sensible thing to do in a culture where everyone has way too many meetings was schedule recurring meetings every day?