|
|
|
|
|
by bombcar
999 days ago
|
|
Code will have requirements like "pipe must flow X gallons/min" or something - and then a table of pipes of various materials and if they meet the requirements at a given length. But they don't list all possible pipes, or all lengths. And the argument is that 3/8 PEX will flow to requirements and have a smaller amount of water sitting in it. |
|