|
|
|
|
|
by sidewndr46
1021 days ago
|
|
it works the same way in construction as well. Before inspection of something like electrical, you go introduce an obvious error that is easy to observe, doesn't take long to fix, and doesn't require additional materials. The inspector can write a report indicating the work is substandard and later gets to write another report indicating the work is corrected and the sign off is complete. Everyone gets to go home happy at that point. |
|
So this sounds like "urban legend" to me, but maybe there is a grain of truth in it?