Hacker News new | ask | show | jobs
by Arrath 1063 days ago
Its standard to ground out a helicopter carrying a sling load before the load is touched/handled (it may even have a longer grounding cable that drags across the ground as it descends) because it can gather some pretty dangerous levels of charge.