|
|
|
|
|
by khuey
1079 days ago
|
|
Presumably the water heater is not the only electrical thing in your house so if things are scheduled correctly (which is a really big if in the construction world) the electrician is coming out the same number of times regardless. |
|
In large buildings things are done different. Architects spend more time designing exactly where the pipes, HVAC, and wires go. Then the trades people work to spec, and they can thus work in any order so long as their parts go where they are told to. This is a lot more effort/cost though, so it isn't worth it for a small house but is critical for something large. A small house turns out to have plenty of space for everyone to design as they go, and thus this is cheaper. For a large building there are a few places where there is barely enough space for everything that must go through that spot so you better ensure upfront there is enough space.