|
|
|
|
|
by notahacker
1079 days ago
|
|
I think the main challenge with modular bathrooms integrated into an otherwise traditional build is that you're plonking a finished unit into a rough-and ready site that has no pipes or wiring to connect to yet and people running round laying bricks and lifting in beams... which feels a little premature. You're not going to fit one through the doors of your average existing building either, and the economics of hiring a large crane just for the upstairs bathroom rather than the entire build probably make less sense It's a bit different when the modules are part of a hotel/apartment block that's entirely built using a modular system. That's common enough in city centre hotels and motels where they're a single full-sized room and nobody can tell the difference. |
|
If it became common I'm sure crews will switch to using a crane for the roof, just because the crane will be there to lift the bathroom in place anyway. However someone needs to start making the factory bathroom first and convince builders to use it.