|
|
|
|
|
by sokoloff
1094 days ago
|
|
As a now-manager/ex-maker, when I’m setting a meeting with an engineer, I will always try to make mine adjacent to an existing meeting on their calendar, meaning their interruption is longer but at least it’s not an additional interruption. (This isn’t always possible, especially for group/team meetings, but is usually possible for 1:1s.) |
|