It’s a matter of capacity. ERCOT only has 1220 MW of interconnection capacity across 4 asynchronous links [1]. Compare this to e.g. California ISO which seems to have about 10,000-15,000 MW of synchronous interconnection capacity [2]. Neither is adequate to fully support historic peak demand in the system [3-4], but California has much more flexibility in emergencies.