|
|
|
|
|
by MikePlacid
1220 days ago
|
|
Not sure how speed of the change is related to batches. The “batch” is related to “due this week”, there never was a single item in this list. “Speed” is related to “due which week”, that depends mostly on the priority of the change, not on how easy it is. Upd. And “change menu items order, fast” is a sign of a problem. We found Mac Cube in ski vacation rental home once. It ran MacOS 10.2 or something. All the menu items were in the places we expected them to be! You think carefully first, then you implement menu items order. Upper Apple -> About this Mac. We managed to break their network config in like 5 minutes! |
|
And I don't think I understand your update to your comment or you don't understand the point of that example from mine. It was illustrating the submission topic: normalization of deviance. Sure, you should think about where things should be but if a customer comes in and says, "Swap these two items" and you can't provide a working version with that single change for months then things have gone off the rails somewhere. I put it in quotes to reflect a statement like what I have heard from those teams I worked with. To them a long effort for a trivial change is normal, when it should be considered deviance.
EDIT: effect->affect. Always trips me up.