|
|
|
|
|
by noahtallen
1236 days ago
|
|
There is something called "Precision Scheduled Railroading" (PSR) which ultimately means that freight trains are longer than they used to be. (https://www.gao.gov/products/gao-23-105420) The result is that these long trains (even 3 miles long) can't fit on sidings, which means that they can't practically give way to, say, Amtrak, when there's only a single track. (Which is a lot of routes!) In other words, freight rail has optimized very hard on saving costs, and since they own the tracks, there's not much Amtrak can do to win. I think the only real solution is dedicated, grade-separated tracks for passenger trains (ideally high speed), but that's unfortunately a pipe dream :( |
|
Some additional enforcement might help, but in the end, with most of the network having large single-track sections, and the long trains of PSR, it's just not a network built for timeliness. About 50% of the train load in America is bulk commodities of one form or another (Coal, stone, grain, etc.) All of these commodities are generally stable and non-spoilable. Thus, the customers don't really care much about punctuality. A power plant can maintain some hours or days of inventory in a big pile next to the plant. If the train with the next load of coal is 8 hours late, it has little impact, you just dig a little deeper into the pile before it's refreshed. 8 hours is a big difference to passengers.