by DannyBee 1255 days ago
This is only true in high cost states. In most states, it's 10-15 a ft plus some minimum cost that is like 1500 bucks for trenching setup. Maybe 15-20 in the worst case.

To redo my service to single phase 800 amps, which required a new transformer on a pole, new commercial panel, 100 feet of large underground drop (parallel MCM 600), etc, georgia power + electrician total cost was 10k.

If i had wanted to drag 3 phase power to my shop, which was a mile away, they would charge 10 bucks a foot, total cost 55k.

(I convert the large single phase instead with a digital 3-phase converter)

PGE/California electricians is particularly horrible about costing - i've seen combined costs (IE between PGE + electrician) of like 15k for panel upgrades that require 10 feet of trenching