|
|
|
|
|
by colejohnson66
1258 days ago
|
|
There was a post a few weeks ago about this. Basically, the freight companies are deliberately making their trains too long to go on the side track (and wait) when Amtrack comes through. So Amtrack is forced to wait instead. This delays them and caused them to lose their priority scheduling. |
|