|
|
|
|
|
by ush
1290 days ago
|
|
Hi. The most important step is permitting as it's a highly regulated industry. The rest is easier. Every jurisdiction has its own rules for permitting. Some govs want to push it more and make it easy (like Spain used to do it). Some don't need solar plants (like Switzerland). I heard Maryland in US is pushing it. I was planning to visit Maryland ministry of energy to learn more actually. |
|
Alpine solar power plants are a huge deal right now, and cause a lot of discussions. They provide big benefits over solar on rooftops in the valley, because they are usually above the fogline and provide better efficiency during winter.
This is the first alpine solar power plant that's fully operational since August: https://www.axpo.com/ch/en/about-us/energy-knowledge.detail.... It's mounted on a dam and thus had less issues with permissions (as it's mounted on an already existing structure with existing power infrastructure).
Here's an English article about two big planned projects in Gondo and Grengiols: https://www.swissinfo.ch/eng/mountaintop-solar-farms-spark-t...