|
|
|
|
|
by dharbin
1285 days ago
|
|
I heard a story about an Intel fab in Arizona that would always produce bad silicon at a certain time a day. After some investigations it was determined that a train passed by at that time every day causing enough seismic activity to disrupt the manufacturing process. |
|