by Schroedingersat
1309 days ago
|
|
You can cycle 40GWh when it's full. Then you can get 350GWh out of it. Then put 240GWh back into it and cycle it a few times, then get another 350GWh out of it again in a month or two. The last 110 fills itself. Trying to paint this as 40GWh is the very definition of bad faith. |
|
But doing so would reduce the usable storage of other facilities using the same body of water. This is explained here:
> At the extreme, the water stored in Talbingo/Jounama could be reduced to 28 GL. This would allow 160 GL of Tantangara water to be accommodated in Talbingo. This equates to a recyclable energy storage capacity for Snowy 2.0 of about 235 GWh (160/239x350). In this case the energy capacity of Tumut 3 is reduced from 60 GWh to 10 GWh, so the net energy storage is 185 GWh (235-50).
How much can Snowy 2 store without adversely impacting other storage facilities? 40 GWh.
Cycling 240 GWh of energy would almost entirely eliminate Tumut 3's storage capacity, and yield a net increase in storage capacity increase of only 185 GWh. 240 GWh is only correct if we ignore the capacity reduction of Tumut 3. And of course, I doubt Tumut 3's operators would agree to this scenario without being bought out because it'd destroy their ability to turn a profit and have a chilling effect on future hydro projects.