AWS claims to be on track to power 100% of their datacenters with renewables by 2025[1]. GCP is carbon neutral right now (probably with renewable power credits or carbon credits) and is on track for similarly 100% renewable by 2030[2]. Microsoft, including Azure, plans 100% renewable energy by 2025[3].