|
|
|
|
|
by iggldiggl
1404 days ago
|
|
The problem is that not a single one of those 10 billions buys neither a single additional vehicle-kilometre being operated [1], not a single metre of additional infrastructure, nor deals in any way with the impending maintenance backlog on the national railway network. [1] Actually right now often the difficulty is even actually operating the currently scheduled timetable due to a lack of staff. |
|