|
|
|
|
|
by mlyle
1411 days ago
|
|
I think the real thing that's difficult is-- every installation is different, in the geometry of the turbines, turbine sizes, terrain shape, etc. Even if you have a perfect implementation of this, and you don't need to deploy new networks, etc, and you put in a lot of NRE to make this easy deploy... how much engineering effort is still needed to start squeezing 1-2% out of a wind farm? |
|