Hacker News new | ask | show | jobs
by ianleighton 1415 days ago
I believe I’ve read this was also due to Iberian gauge high speed rail technology not really being existent at the time Spain started building HSR in a hurry for Expo ‘92? in Sevilla, and they’ve continued using standard gauge for it (to the benefit of the link with France).

However the huge investment in HSR (longest network after China, but low utilization), has also come at the cost of the local and regional train network (which still use broad gauge, yes there are gauge changing trains, but the broad gauge network is languishing).