This story was about getting the first iteration of my product launched (somewhere beyond MVP but still rough).
I had a fractional CTO / project manager / React dev + backend dev + devops + designer. All between 50% and 100% for 8 weeks. I also heavily participated in backend work.
Total cost came in a little over US20k.
I did not stipulate milestones and I was lucky because everything worked out (except documentation).
I had a fractional CTO / project manager / React dev + backend dev + devops + designer. All between 50% and 100% for 8 weeks. I also heavily participated in backend work.
Total cost came in a little over US20k.
I did not stipulate milestones and I was lucky because everything worked out (except documentation).
I definitely suggest stipulating milestones.