|
|
|
|
|
by jagger27
1459 days ago
|
|
I can't imagine a scenario where you already have a 1km long conduit that doesn't already have copper or fibre in it. Why would you choose to push a kilometre of brand new copper twisted pair line down an existing conduit just to squeeze 10 Mbps out of it? The hard part is already done and fibre equipment is pretty cheap. If the conduit already has a phone line in it that isn't being used, sure. |
|
Do you happen to know, for these long conduits is it typical to do a solid run or to put access panels at regular intervals? If you're running a new cable are you actually trying to run a 1km snake through a pipe, a 100m snake 10 times, 50m x20, or something in between?.
I've never seen anyone run a 1km cable, but I've seen buildings be rewired with tens of kilometers of new cables a couple times.