|
|
|
|
|
by bsder
1485 days ago
|
|
Because I was willing to hand them money? I'm an electrical engineer and several of the testing systems we design run on various levels of industrial three phase. It would be nice to wire them up according to standard so when we hand them off to the union guys actually installing them on the factory floor we're all on the same page. In addition, it would be nice to know the standards so that I can tell when it's done wrong. For example, I once took a shot of 480VAC to my right arm due to a system having been miswired, and I very much never want to do that again. |
|