|
|
|
|
|
by ncmncm
1492 days ago
|
|
Again, what matters is cost. Do you need to spend 7x as much on renewables as you would have on your (to date massively subsidized) nukes? No. How much does a GW of nuke really cost, all told, in the US? Current numbers look bad. Disaster insurance alone would price them out of the market. Decommissioning cost is never included in the ticket price. Nobody can quote a reliable price for a nuke in the US. Then, we have operating cost. The more total power you need, the worse the nukes look. Renewable costs are still in free fall, so setting out, 10 years hence, to double total capacity costs much less than it cost to get to that point. Nukes you started on today, meanwhile, would be just beginning to come online, after ten years shelling out for mined carbon they have not displaced yet. Does it seem unfair to charge that to your nukes? Calculations divorced from real-world conditions do not enlighten. We are nowhere near short of land to site panels on -- they coexist, synergistically, with crops and pasture, and industrial rooftops, parking lots, reservoirs and canals -- or of silicon to make them out of. We need not discuss the amount of concrete that would be needed to build out your nukes. |
|