|
|
|
|
|
by cptcobalt
1523 days ago
|
|
Indeed, if we're assuming that they'll charge during the day to discharge at full power at night, it won't cover all of overnight use, but with the current composition of grids typically it's what you need to cover after sundown until most go to sleep (and energy use reduces). A project like this doesn't need to reduce base load, but there surely needs to be renewable (or nuclear) energy projects to replace base load. (This is an over simplification, but base load supply is built to be more steady state, less real-time reactive to the needs of grid.) Also, the "time" of the battery is just a function of storage size and inverter sizing at peak discharge. It's often selected based on how the operator expects it to be used. (For example, Tesla sells megapacks in 2hr/4hr variants [1], and I think a lot of other grid-scale storage works this way. A 2hr megapack replaces some battery bays with more inverters.) While the battery is 4 hour capable, the operator could really intend for this to provide a constant overnight supply, and it could certainly provide that. [1]: https://www.tesla.com/megapack/design |
|