How old's the plant? To what design is it built? I feel like the CFIT design basis is already a little optimistic, but we also don't know that that was the design basis in this case.
completed in 1989, with a 6th reactor added in 1995.
For what it's worth, the russian convoy is firing on the administrative building, not the power units themselves, but I don't know specifically what is in said admin bldg or what the ramifications for operation/shutdown of the power units/cooling systems works if the admin building burns down and/or gets shot up.
For what it's worth, the russian convoy is firing on the administrative building, not the power units themselves, but I don't know specifically what is in said admin bldg or what the ramifications for operation/shutdown of the power units/cooling systems works if the admin building burns down and/or gets shot up.