|
|
|
|
|
by MarcAurel_
1572 days ago
|
|
Wind turbine blades can interfere microwave links. I worked a few years as a telecom engineer in France:
wind turbine promoters have to consult telecom operators to prevent disrupting existant MW links with their projects. The usual rule was to observe a 500m clearance between MW line-of-sight paths (1st Fresnel zone) and future wind turbine installations. Edit: you can read more about all this in this paper: https://castlerockmicrowave.com/wp-content/uploads/Wind-Farm... |
|