|
|
|
|
|
by twox2
1573 days ago
|
|
Interesting, I'll check it out thanks. I do think the Phoenix Project is too verbose for the story they have to tell, but the "aha" moment is really just the parallel that engineering can be treated like assembly line manufacturing. It was good introduction to Kanban. |
|