|
|
|
|
|
by Cthulhu_
1569 days ago
|
|
Yes it can, it just takes longer to put it in ships or trains. Transport by ship from where NordStream would leave the land to China is becoming feasible now that the north pole is melting, and Russia is really interested in that. A good, seemingly unbiased video on the subject is https://www.youtube.com/watch?v=pvy9usF7ohE |
|
-Nordstream 2 has a capacity to transport 55 billion cubic meters per year[1]
-The biggest LNG transport ship "Mozah" built by Samsung Heavy Industries can transport a equivalent of ~162 million cubic meters in a single load
This leads to a ~339,5 full loads per year needed to replace the pipeline volume. Nordstream 2 probably wouldn't run at full capacity initially but even at 50% utilisation it would be nearly impossibe to replace it with shipping.
[1]https://www.gazprom.com/projects/nord-stream2/
[2]https://en.wikipedia.org/wiki/Mozah