|
|
|
|
|
by cjenkins
1610 days ago
|
|
How much does the cost of labor really factor into a 20B factory? Assume 200k fully loaded at 3000 people is 600M a year on labor. That's not nothing but it seems pretty insignificant if you can save enough on the actual buildout of the fab(s). |
|