|
|
|
|
|
by donttrustatoms
1608 days ago
|
|
Thanks for the followup as well. I'll just respond on a couple of the points: - you don't see these detailed core schematics with analyses because in our design they are designated export controlled (ECI) as I mentioned. It doesn't mean that they aren't in there or that they haven't been extensively performed and documented. - the endeavor (and cost) of downblending EBR-II fuel over many years has been based on the national and state nonproliferation agreements to downblend this high enriched used fuel from EBR-II. Don't confuse that endeavor with processing used, low-enriched fuel from existing plants. In the one case, the downblending work was being performed for many years in the interest of downblending before storing as waste (except now, instead, it can be used to produce clean power and demonstrate a FOAK fission plant). In the other case, recycling existing waste, we are already working with DOE (and starting NRC interactions) about deploying recycling existing nuclear waste for fuel. I can tell you it's incredibly cost effective for a fast reactor to utilize the TRU in existing low-enriched waste and that is our goal for not just feel-good reasons but also for economic reasons. It is not false nor disingenuous. It's true that the burnup is far less than would be ultimately most economically efficient. The FOAK was intended to serve as a bit of an MVP as I already mentioned. But it's key that larger doesn't mean less safety. The fundamentals of the safety in this case lie in how the fuel has inherent shutdown characteristics, which were proven true of EBR-II (at 65 MWth) even as it's true of Aurora (<10MWth). Many different plants have different mechanisms of safety at various size ranges! Thanks for engaging and your thoughtful responses. |
|