Hacker News new | ask | show | jobs
by sbradford26 1669 days ago
I wouldn't say that plumbing was the biggest issue. A big limiting factor was the control systems available then. I believe a couple of the N1 failures were caused by control system failures. With modern controls you can monitor and control each engine with much more granularity.