|
|
|
|
|
by msisk6
1667 days ago
|
|
The ERCOT campus has their own generation capability along with sitting between two distribution grids. Same with their DR site in Bastrop. In the case of a black start condition (grid totally down), ERCOT would need to come up first to coordinate the grid restoration. Taylor is an ideal place for a large manufacturing operation since it's close to major highways and railroads, not too far from Austin, and land is very cheap. |
|
*was
I'm between Taylor and Austin (Bagdad Rd, Leander). 1 acre lots along this strip have gone from ~$115k a year ago, to some recent sales at ~325k.