Hacker News new | ask | show | jobs
by jamincan 1715 days ago
I know that in Ontario, the Bruce Nuclear Plant (with about 8GW capacity) is designed to run indefinitely through a power outage and did during the Northeast blackout in 2003. I assume that sort of power would be enough to bootstrap the grid in Ontario.