|
|
|
|
|
by irrational
1889 days ago
|
|
This happened to me this past week. I built exactly what the spec said. They came back and said it all looks good, except we expected this to be that. Um, nothing about that was in the spec, nor was it ever mentioned verbally in a meeting. Making the change from this to that will require everything to be redone since it requires fundamental changes. I would have built it differently had it been communicated to me from the beginning. Apparently it didn’t occur to them to mention it. But they really want it. So I’ve started rebuilding it. Sigh. |
|