| If you want nuclear to happen: 1) Disrupt the nuclear construction contracting process. Until fleet contractors like Bechtel et al are stopped from parasitizing the industry, it's going nowhete due to spiralling costs. 2) Lower the cost of reinforced concrete. 3) Close the fuel cycle. 3 is technically feasible, 2 isn't very sexy, but possible. 1 seems insurmountable. |
Tesla committed to having the Hornsdale Power Reserve built in 100 days or it was free [2]. That is what nuclear is up against. Please don't argue base load; there is no need for base load, only diverse firm dispatchable generation assets [3], robust transmission, and demand response for non-essential industrial loads.
[1] https://www.utilitydive.com/news/solar-plus-storage-poised-t...
[2] https://www.vox.com/energy-and-environment/2017/11/28/167090...
[3] https://energypost.eu/dispelling-nuclear-baseload-myth-nothi...