|
|
|
|
|
by gwoplock
1948 days ago
|
|
Yes. https://spp.org/markets-operations/current-grid-conditions/ > Feb. 16 at 6:15 a.m. SPP declared an EEA Level 3. System-wide generating capacity had dropped below current load of approximately 42 gigawatts (GW) due to extremely low temperatures, inadequate supplies of natural gas and wind generation. SPP directed member utilities to implement controlled, temporary interruptions of service. |
|