|
|
|
|
|
by epistasis
1953 days ago
|
|
Regardless, the interconnection absolutely does not care about the MWh of the battery. It has no concern, no care, no need to know. So when talking about interconnection queues, only the GW are reported. As far as 17GW of battery, the only technology shipping at that scale is lithium ion, and all lithium ion grid batteries are designed for 30 minutes to 4 hours of duration at maximum discharge. The idea of a week long battery is not a realistic one at this stage. With Texas' excellent solar resources, it may never need long-duration storage, whenever/if that tech gets developed. |
|