|
|
|
|
|
by snowwindwaves
1946 days ago
|
|
Electrical engineers wouldn't build a power line to Texas with a capacity of 5000 MW and then put intertie hardware such as phase shifters or ac-dc-ac converter with capacity of 1000 MW on the end of it. So it is likely that the transmission capacity and intertie capacity are exactly the same! |
|