Build 10 damn factories if needed. For biotech it is cheap - hundreds of millions, not billion range as for semiconductor. As a reminder - saving Lufthansa alone consumed €9B: https://www.bbc.com/news/business-52801131
Sure, and it is the mney that is building these factories? You need people, you need certification. And that is once the building and equipment is their. No dea why people always ignore the time aspect of supply chains. Having more capacity in 4 months isn't any good now. Nor is it n 4 months when existing capacites are suffcient in 4 months anyway.
And they are using new site, Biontech in Marburg (a reporposed existing facility if memory serves well), Sanofi will be ready in summer to produce the Biontech vaccine as well. These things take time, rushing them is never a good idea.
And they are using new site, Biontech in Marburg (a reporposed existing facility if memory serves well), Sanofi will be ready in summer to produce the Biontech vaccine as well. These things take time, rushing them is never a good idea.