Hacker News new | ask | show | jobs
by tda 1971 days ago
And because of this ship it is easy to see how expensive topside removal must be. The vessel costed some 2.5B or so. Recovering that in a few dozen decommissionings means a Hugh price. And don't forget the operational cost of a crew of a few hundred, easily adds up to a few 100k/day. Then the topside, probably full of toxic flame retardants and asbestos needs to be dealt with.