|
|
|
|
|
by posix_me_less
1995 days ago
|
|
Incorrect, we don't need all power plants to ramp up/down in seconds. Energy demand of a provider during the day follows roughly the same curve for the specific time of year. Thus ramping up/down of baseload can be and is planned in advance. The random variations from that prediction can be handled by smaller number of responsive plants. |
|