It's kind of interesting that the ~100 people would have a whole full-time support team just for assisting the decisions (not even making them) of their compensation.
Legally, you’d hire consultants anyways, so the cost basis is irrelevant. If you are required to have insurance or a specific license but you could avoid it through a costly self education process, you end up in the same place.
Going back, let’s say the top is $100M, let’s say the bottom is....(not sure how to guess this)....
Ok, so, the 7th executive made $20M based on this dated public doc (1). So let’s say the top slate is $250M. Going from $20M to $1M for everyone else is ... $900M? Anyways so $1.15B.
The real thing though it’s probably not the cash expenditure part. It’s probably the GROWTH you can get by designing it correct. You’d be okay to spend for results.
Anyways at a high level, let’s say you have 5 FTEs at $200k, plus overhead at 100%, that’s $2M on $1B or 0.5%? Meh, it’s a transaction cost.
Going back, let’s say the top is $100M, let’s say the bottom is....(not sure how to guess this)....
Ok, so, the 7th executive made $20M based on this dated public doc (1). So let’s say the top slate is $250M. Going from $20M to $1M for everyone else is ... $900M? Anyways so $1.15B.
The real thing though it’s probably not the cash expenditure part. It’s probably the GROWTH you can get by designing it correct. You’d be okay to spend for results.
Anyways at a high level, let’s say you have 5 FTEs at $200k, plus overhead at 100%, that’s $2M on $1B or 0.5%? Meh, it’s a transaction cost.
https://www.sec.gov/Archives/edgar/data/1288776/000130817913...