|
|
|
|
|
by toast0
2033 days ago
|
|
The guestimate from the utility district was $50,000. And that probably doesn't include onsite work, because I'm quite a ways back from the street and have underground power and telephone, so there's no poles to go from the steet with aerial fiber. I'm going to hold tight and wait for either a neighborhood group to form (unlikely) or someone else on the route to extend the network so I don't have to extend it all the way. |
|