|
|
|
|
|
by mikeyouse
2043 days ago
|
|
Depends so much on siting too.. a lot of assumptions on foundations and water handling are baked into plans and even if the reactor room is the same size, you’re going to need an engineering firm comfortable with signing off on a nuke plant run the math based on the new soil composition and 500-year storm rainfalls, etc. |
|