|
|
|
|
|
by Hokusai
2100 days ago
|
|
> In the design, the slopes of the drainage pipes and the velocity constraints are selected in a way to have minimum excavation depths, and to have the flow velocity within its design ranges. I guess that the goal is to make it cost effective. To dig deeper that the strictly necessary would add durability that a temporary camp does not need and a lot of extra cost. It would have been nice to know the advantages and disadvantages of each camp design. But, I guess that it was not inside the scope of designing the sewage. |
|