> which, by the way, is now being built Yea, over 25 years late. The Green Line (opened 1995) was originally supposed to have a real LAX station, instead of the (current) station-near-LAX-with-a-bus-transfer. The Crenshaw Corridor train (which connects to the Green Line) will open an LAX station sometime in 2021, if it isn't delayed. |
|
...until the FAA intervened and said the Metro couldn't build all the way out to the airport, due to the potential danger from crossing existing flight paths. (In a nutshell: the Green Line would have crossed perpendicularly to the existing runways, which would be fine normally but a huge risk in the event a plane overshoots or undershoots the runway.)